{"id":99,"date":"2017-06-29T14:02:12","date_gmt":"2017-06-29T17:02:12","guid":{"rendered":"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/?page_id=99"},"modified":"2017-08-08T09:37:17","modified_gmt":"2017-08-08T12:37:17","slug":"rink-froid-bell-aliant-centre","status":"publish","type":"page","link":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/rink-froid-bell-aliant-centre\/","title":{"rendered":"Bell Aliant Centre"},"content":{"rendered":"<p><strong>Company Overview<\/strong><\/p>\n<p><strong><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-156 size-thumbnail aligncenter\" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/oS5MIEYh-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" srcset=\"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/oS5MIEYh-150x150.jpg 150w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/oS5MIEYh-300x300.jpg 300w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/oS5MIEYh.jpg 512w\" sizes=\"(max-width: 150px) 100vw, 150px\" \/><\/strong><\/p>\n<div id=\"attachment_169\" style=\"width: 594px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-169\" class=\"wp-image-169 size-full\" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/CARICentre-0001.jpeg\" alt=\"\" width=\"584\" height=\"195\" srcset=\"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/CARICentre-0001.jpeg 584w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/CARICentre-0001-300x100.jpeg 300w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/CARICentre-0001-500x167.jpeg 500w\" sizes=\"(max-width: 584px) 100vw, 584px\" \/><p id=\"caption-attachment-169\" class=\"wp-caption-text\"><strong>Bell Aliant Centre<\/strong> &#8211; University of Prince Edward Island Campus<\/p><\/div>\n<p>&nbsp;<\/p>\n<p><span lang=\"EN-CA\">Formerly Capital Area Recreation Inc (CARI), the Bell Aliant Centre is Charlottetown and the surrounding area\u2019s most comprehensive athletics facility.\u00a0 Covering 160,000 square feet, this building houses an aquatics facility, two ice surfaces, and also provides space for other community and industry organizations<\/span><\/p>\n<p><strong>Problem Statement and Purpose of Design<\/strong><\/p>\n<p>Bell Aliant\u2019s current system works with three loops, a Heat Transfer Loop (HTL), Heat Recovery Loop (HRL) and an Ammonia Loop. The heat would start in the Ammonia Loop via rink compressors and travel into the Shell &amp; Tube as well as the Plate &amp; Frame.<\/p>\n<p>The problem to solve is to <strong>re-purpose the existing desuperheaters<\/strong> (water heaters powered by the hot ammonia refrigerant) for Rink B to reheat the building\u2019s heating water, which is normally heated by district heat, and consequently reduce district heat usage.<\/p>\n<div id=\"attachment_175\" style=\"width: 235px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-175\" class=\"wp-image-175 size-medium\" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_20160922_093714-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_20160922_093714-225x300.jpg 225w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_20160922_093714-768x1024.jpg 768w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_20160922_093714.jpg 1944w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><p id=\"caption-attachment-175\" class=\"wp-caption-text\">Heat exchanger<\/p><\/div>\n<div id=\"attachment_176\" style=\"width: 235px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-176\" class=\"wp-image-176 size-medium\" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_20160922_092706-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_20160922_092706-225x300.jpg 225w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_20160922_092706-768x1024.jpg 768w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_20160922_092706.jpg 1944w\" sizes=\"(max-width: 225px) 100vw, 225px\" \/><p id=\"caption-attachment-176\" class=\"wp-caption-text\">Diffuser<\/p><\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p style=\"text-align: center\"><a href=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/ACTP0040.mov\">Video of Bell Aliant Centre tour of existing desuperheaters<\/a><\/p>\n<p><strong>Design Solution<\/strong><\/p>\n<p>The solution proposed is to <strong>repurpose the Rink B desuperheaters<\/strong> to re-heat a branch of the heating-water return (HWR) line. When Rink B&#8217;s refrigeration plant is running, the HWR water temperature entering the District Heat Exchanger will be increased, and it will require less metered heat to bring it back to heating-water supply (HWS) temperature. Consequently, Bell Aliant Centre&#8217;s energy bill for district heat will be less, having recycled heat within the building.<\/p>\n<div id=\"attachment_168\" style=\"width: 626px\" class=\"wp-caption alignnone\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-168\" class=\"wp-image-168 size-full\" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.34.04-AM.png\" alt=\"\" width=\"616\" height=\"285\" srcset=\"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.34.04-AM.png 616w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.34.04-AM-300x139.png 300w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.34.04-AM-500x231.png 500w\" sizes=\"(max-width: 616px) 100vw, 616px\" \/><p id=\"caption-attachment-168\" class=\"wp-caption-text\">Valve and Gauges Changes<\/p><\/div>\n<p style=\"text-align: center\"><strong>Rink B System Desuperheater Schematic (Pipe Only)<\/strong><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-170 aligncenter\" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.39.55-AM.png\" alt=\"\" width=\"270\" height=\"297\" \/><\/p>\n<p>The Above drawing shows three changes in the mechanical drawings of the system: ie. A 50mm x 32mm TEE, 32mm steel piping of approximately 15ft and one elbow. When Rink B\u2019s refrigeration plant is running, the HWR water temperature entering the District Heat Exchanger will be increased, and<em><strong> it will require less metered steam to heat it back to HWS temperature.<\/strong><\/em><\/p>\n<div id=\"attachment_213\" style=\"width: 426px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-213\" class=\"wp-image-213 \" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/20170406_111313.jpg\" alt=\"\" width=\"416\" height=\"238\" \/><p id=\"caption-attachment-213\" class=\"wp-caption-text\">Rink Froid and Client Bell Aliant Centre<\/p><\/div>\n<p><strong>Implementation Plan<\/strong><\/p>\n<p>The implementation of the final design will first start in the templifier room. The valve connecting the snowmelt pit to the Heating Water Supply (HWS) closest to the HWS must first be closed to inhibit flow to the line, then the Triple Duty Valve (TDV) must also be closed to isolate the line that contains pump C-16.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-171 size-full\" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.48.02-AM.png\" alt=\"\" width=\"610\" height=\"352\" srcset=\"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.48.02-AM.png 610w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.48.02-AM-300x173.png 300w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/Screen-Shot-2017-07-25-at-10.48.02-AM-500x289.png 500w\" sizes=\"(max-width: 610px) 100vw, 610px\" \/><\/p>\n<p><strong>Sustainability<\/strong><\/p>\n<p>Materials will be Reused. Although some new machinery is required, it&#8217;s a small<br \/>\nenvironmental investment compared to the equipment which is existing and will be reused.<\/p>\n<p><strong>Conclusion<\/strong><\/p>\n<p>Early on in the project, time was devoted to understanding the Client&#8217;s systems from a heat-recovery perspective, and exploring the possibilities for using available heat within the facility. Concepts were developed and compared, leaving desuperheater repurposing as the proposed solution.<\/p>\n<p>The solution was prototyped using a simulation model, which was based on testing of the existing Rink A desuperheaters. When the simulation was complete <strong>it was found that the solution would save Bell Aliant Centre about $2027 per year in energy<\/strong>.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-575 aligncenter\" src=\"http:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_00801_Fotor-300x248.jpg\" alt=\"\" width=\"300\" height=\"248\" srcset=\"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_00801_Fotor-300x248.jpg 300w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_00801_Fotor-768x635.jpg 768w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_00801_Fotor-1024x846.jpg 1024w, https:\/\/projects.upei.ca\/ssdeprojectportfolios\/files\/2017\/06\/IMG_00801_Fotor-363x300.jpg 363w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p><em>The result is a proposal with a <strong>low capital cost<\/strong>, a <strong>short payback period<\/strong>, and a <strong>straightforward approach<\/strong> to <\/em><em>moving excess heat back into the building mechanical systems, which can be recommended for <\/em><em>implementation.<\/em><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Company Overview &nbsp; Formerly Capital Area Recreation Inc (CARI), the Bell Aliant Centre is Charlottetown and the surrounding area\u2019s most comprehensive athletics facility.\u00a0 Covering 160,000 square feet, this building houses an aquatics facility, two ice surfaces, and also provides space &hellip; <a href=\"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/rink-froid-bell-aliant-centre\/\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":183,"featured_media":418,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"sidebar-page.php","meta":{"footnotes":""},"tags":[],"_links":{"self":[{"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/pages\/99"}],"collection":[{"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/users\/183"}],"replies":[{"embeddable":true,"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/comments?post=99"}],"version-history":[{"count":24,"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/pages\/99\/revisions"}],"predecessor-version":[{"id":642,"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/pages\/99\/revisions\/642"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/media\/418"}],"wp:attachment":[{"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/media?parent=99"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/projects.upei.ca\/ssdeprojectportfolios\/wp-json\/wp\/v2\/tags?post=99"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}