Key Activities
The project consisted of four major tasks leading to the assembly of the panel. These tasks were:
1 – Simulating The System
2 – PLC Programming
3 – HMI Programming
4 – Wiring
The project consisted of four major tasks leading to the assembly of the panel. These tasks were:
1 – Simulating The System
2 – PLC Programming
3 – HMI Programming
4 – Wiring